Beaufort http://publicradioeast.org en NOAA Beaufort Lab Faces Possible Closure http://publicradioeast.org/post/noaa-beaufort-lab-faces-possible-closure-0 <p>The NOAA Lab in Beaufort is involved with collecting and analyzing data on marine mammal species, assessing fish stocks, and working to understand the Atlantic ecosystem. Mon, 07 Apr 2014 15:37:53 +0000 Jared Brumbaugh 38297 at http://publicradioeast.org The Down East Journal (03/07/14) http://publicradioeast.org/post/down-east-journal-030714 <p><span style="line-height: 1.5;">&nbsp;&nbsp;</span>This week on the Down East Journal, Naval Hospital Camp Lejeune is using futuristic simulation technology to train students and give experienced physicians a place to refine their skills.&nbsp; We speak with experts about the new simulation lab and explain how it works.&nbsp; And, a living history program this weekend in Beaufort focuses on the signs that served as markers for the Underground Railroad.&nbsp; The Down East Journal airs Friday at noon on all of the PRE stations, and Saturday at noon on News and Ideas.</p><p></p><p></p><p></p> Thu, 06 Mar 2014 17:42:34 +0000 Jared Brumbaugh 35820 at http://publicradioeast.org The Down East Journal (03/07/14) Construction Begins This Spring On New Bridge In Beaufort http://publicradioeast.org/post/construction-begins-spring-new-bridge-beaufort <p>The bidding process to place a new high rise bridge linking Beaufort to Morehead City is underway.&nbsp; Construction begins this Spring to replace the current Gallants Channel drawbridge.&nbsp; We’ll talk about the project with the DOT and Beaufort Mayor Richard Stanley.</p><p></p> Mon, 27 Jan 2014 14:53:26 +0000 Jared Brumbaugh 32922 at http://publicradioeast.org Construction Begins This Spring On New Bridge In Beaufort The Down East Journal (01/24/14) http://publicradioeast.org/post/down-east-journal-012414 <p><span style="line-height: 1.5;">&nbsp;&nbsp;</span>The bidding process to place a new high rise bridge linking Beaufort to Morehead City is underway.&nbsp; Construction begins this Spring to replace the current Gallants Channel drawbridge.&nbsp; This week on the Down East Journal, we’ll talk about the project with the DOT and Beaufort Mayor Richard Stanley.&nbsp; The Down East Journal airs Friday at noon on all of the PRE stations, and Saturday at noon on News and Ideas.</p> Wed, 22 Jan 2014 17:23:52 +0000 Jared Brumbaugh 32576 at http://publicradioeast.org The Down East Journal (01/24/14) The Down East Journal (01/24/14) http://publicradioeast.org/post/down-east-journal-012414-0 <p><span style="line-height: 1.5;">&nbsp;&nbsp;</span>The bidding process to place a new high rise bridge linking Beaufort to Morehead City is underway.&nbsp; Construction begins this Spring to replace the current Gallants Channel drawbridge.&nbsp; This week on the Down East Journal, we’ll talk about the project with the DOT and Beaufort Mayor Richard Stanley.&nbsp; The Down East Journal airs Friday at noon on all of the PRE stations, and Saturday at noon on News and Ideas.</p><p></p> Wed, 22 Jan 2014 17:23:50 +0000 Jared Brumbaugh 32577 at http://publicradioeast.org The Down East Journal (01/24/14)